Spain• Barcelona
2020

Barcelona Railway Bridge Expansion Joint Project 2020-17

Successful installation of bridge expansion joints for the Barcelona railway bridge project. The project involved upgrading existing infrastructure with a focus on efficiency.

Barcelona Railway Bridge Expansion Joint Project 2020-17

Challenges

  • Large thermal movement accommodation
  • High traffic volume requiring minimal disruption
  • Strict quality and safety standards

Solutions

  • Modular expansion joint system installation
  • Pre-fabricated components for rapid installation
  • Comprehensive quality control procedures

Outcomes

  • Successful project completion on schedule
  • Excellent performance under traffic loads
  • Zero maintenance required in first 3 years