China• Beijing
2015
Beijing Pedestrian Bridge Expansion Joint Project 2015-90
Successful installation of bridge expansion joints for the Beijing pedestrian bridge project. The project involved new construction with a focus on durability.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Modular expansion joint system installation
- •High-strength materials for durability
- •Pre-fabricated components for rapid installation
Outcomes
- •Zero maintenance required in first 3 years
- •Client satisfaction and positive feedback
- •Extended service life exceeding design requirements