Australia• Brisbane
2024
Brisbane Long-Span Bridge Expansion Joint Project 2024-100
Successful installation of bridge expansion joints for the Brisbane long-span bridge project. The project involved upgrading existing infrastructure with a focus on performance.

Challenges
- •Challenging installation conditions
- •High traffic volume requiring minimal disruption
- •Strict quality and safety standards
Solutions
- •Modular expansion joint system installation
- •High-strength materials for durability
- •Pre-fabricated components for rapid installation
Outcomes
- •Client satisfaction and positive feedback
- •Zero maintenance required in first 3 years
- •Excellent performance under traffic loads