Australia• Brisbane
2015
Brisbane Urban Overpass Expansion Joint Project 2015-190
Successful installation of bridge expansion joints for the Brisbane urban overpass project. The project involved bridge renovation with a focus on efficiency.

Challenges
- •Tight project timeline
- •Challenging installation conditions
- •Strict quality and safety standards
Solutions
- •Advanced sealing system for waterproofing
- •High-strength materials for durability
- •Comprehensive quality control procedures
Outcomes
- •Extended service life exceeding design requirements
- •Successful project completion on schedule
- •Client satisfaction and positive feedback