South Korea• Daejeon
2018
Daejeon Urban Overpass Expansion Joint Project 2018-95
Successful installation of bridge expansion joints for the Daejeon urban overpass project. The project involved infrastructure modernization with a focus on performance.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Pre-fabricated components for rapid installation
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
Outcomes
- •Excellent performance under traffic loads
- •Extended service life exceeding design requirements
- •Client satisfaction and positive feedback