Germany• Frankfurt
2018
Frankfurt Long-Span Bridge Expansion Joint Project 2018-58
Successful installation of bridge expansion joints for the Frankfurt long-span bridge project. The project involved infrastructure modernization with a focus on efficiency.

Challenges
- •High traffic volume requiring minimal disruption
- •Tight project timeline
- •Strict quality and safety standards
Solutions
- •Comprehensive quality control procedures
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
Outcomes
- •Extended service life exceeding design requirements
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years