Germany• Frankfurt
2024
Frankfurt Long-Span Bridge Expansion Joint Project 2024-108
Successful installation of bridge expansion joints for the Frankfurt long-span bridge project. The project involved upgrading existing infrastructure with a focus on durability.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •Tight project timeline
Solutions
- •Comprehensive quality control procedures
- •Pre-fabricated components for rapid installation
- •High-strength materials for durability
Outcomes
- •Zero maintenance required in first 3 years
- •Excellent performance under traffic loads
- •Client satisfaction and positive feedback