Germany• Frankfurt
2024

Frankfurt Long-Span Bridge Expansion Joint Project 2024-108

Successful installation of bridge expansion joints for the Frankfurt long-span bridge project. The project involved upgrading existing infrastructure with a focus on durability.

Frankfurt Long-Span Bridge Expansion Joint Project 2024-108

Challenges

  • Challenging installation conditions
  • Strict quality and safety standards
  • Tight project timeline

Solutions

  • Comprehensive quality control procedures
  • Pre-fabricated components for rapid installation
  • High-strength materials for durability

Outcomes

  • Zero maintenance required in first 3 years
  • Excellent performance under traffic loads
  • Client satisfaction and positive feedback