Japan• Fukuoka
2017
Fukuoka Long-Span Bridge Expansion Joint Project 2017-138
Successful installation of bridge expansion joints for the Fukuoka long-span bridge project. The project involved upgrading existing infrastructure with a focus on safety.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Modular expansion joint system installation
- •Comprehensive quality control procedures
- •High-strength materials for durability
Outcomes
- •Successful project completion on schedule
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years