Japan• Fukuoka
2016
Fukuoka Pedestrian Bridge Expansion Joint Project 2016-135
Successful installation of bridge expansion joints for the Fukuoka pedestrian bridge project. The project involved bridge renovation with a focus on safety.

Challenges
- •Tight project timeline
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Comprehensive quality control procedures
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
Outcomes
- •Extended service life exceeding design requirements
- •Successful project completion on schedule
- •Excellent performance under traffic loads