Fukuoka Pedestrian Bridge Expansion Joint Project 2022-175
Successful installation of bridge expansion joints for the Fukuoka pedestrian bridge project. The project involved bridge renovation with a focus on durability.

Challenges
- •Tight project timeline
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Comprehensive quality control procedures
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
Outcomes
- •Zero maintenance required in first 3 years
- •Excellent performance under traffic loads
- •Extended service life exceeding design requirements