Fukuoka Pedestrian Bridge Expansion Joint Project 2022-175

Successful installation of bridge expansion joints for the Fukuoka pedestrian bridge project. The project involved bridge renovation with a focus on durability.

Fukuoka Pedestrian Bridge Expansion Joint Project 2022-175

Challenges

  • Tight project timeline
  • Strict quality and safety standards
  • Large thermal movement accommodation

Solutions

  • Comprehensive quality control procedures
  • Modular expansion joint system installation
  • Pre-fabricated components for rapid installation

Outcomes

  • Zero maintenance required in first 3 years
  • Excellent performance under traffic loads
  • Extended service life exceeding design requirements