Japan• Fukuoka
2018

Fukuoka Railway Bridge Expansion Joint Project 2018-122

Successful installation of bridge expansion joints for the Fukuoka railway bridge project. The project involved upgrading existing infrastructure with a focus on efficiency.

Fukuoka Railway Bridge Expansion Joint Project 2018-122

Challenges

  • Challenging installation conditions
  • Strict quality and safety standards
  • Tight project timeline

Solutions

  • High-strength materials for durability
  • Advanced sealing system for waterproofing
  • Pre-fabricated components for rapid installation

Outcomes

  • Successful project completion on schedule
  • Excellent performance under traffic loads
  • Zero maintenance required in first 3 years