Mexico• Guadalajara
2021
Guadalajara Railway Bridge Expansion Joint Project 2021-80
Successful installation of bridge expansion joints for the Guadalajara railway bridge project. The project involved upgrading existing infrastructure with a focus on efficiency.

Challenges
- •Strict quality and safety standards
- •Large thermal movement accommodation
- •High traffic volume requiring minimal disruption
Solutions
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
Outcomes
- •Successful project completion on schedule
- •Client satisfaction and positive feedback
- •Extended service life exceeding design requirements