China• Guangzhou
2017
Guangzhou Pedestrian Bridge Expansion Joint Project 2017-119
Successful installation of bridge expansion joints for the Guangzhou pedestrian bridge project. The project involved upgrading existing infrastructure with a focus on efficiency.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •High traffic volume requiring minimal disruption
Solutions
- •Comprehensive quality control procedures
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
Outcomes
- •Extended service life exceeding design requirements
- •Client satisfaction and positive feedback
- •Zero maintenance required in first 3 years