Germany• Hamburg
2016
Hamburg Pedestrian Bridge Expansion Joint Project 2016-15
Successful installation of bridge expansion joints for the Hamburg pedestrian bridge project. The project involved upgrading existing infrastructure with a focus on durability.

Challenges
- •Tight project timeline
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
Solutions
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
Outcomes
- •Successful project completion on schedule
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years