South Korea• Incheon
2015
Incheon Urban Overpass Expansion Joint Project 2015-131
Successful installation of bridge expansion joints for the Incheon urban overpass project. The project involved infrastructure modernization with a focus on efficiency.

Challenges
- •Tight project timeline
- •Challenging installation conditions
- •Strict quality and safety standards
Solutions
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
- •High-strength materials for durability
Outcomes
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years
- •Extended service life exceeding design requirements