United Kingdom• Leeds
2022
Leeds Railway Bridge Expansion Joint Project 2022-149
Successful installation of bridge expansion joints for the Leeds railway bridge project. The project involved new construction with a focus on durability.

Challenges
- •Tight project timeline
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
Solutions
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
- •Pre-fabricated components for rapid installation
Outcomes
- •Extended service life exceeding design requirements
- •Client satisfaction and positive feedback
- •Zero maintenance required in first 3 years