United Kingdom• Leeds
2022

Leeds Railway Bridge Expansion Joint Project 2022-149

Successful installation of bridge expansion joints for the Leeds railway bridge project. The project involved new construction with a focus on durability.

Leeds Railway Bridge Expansion Joint Project 2022-149

Challenges

  • Tight project timeline
  • High traffic volume requiring minimal disruption
  • Large thermal movement accommodation

Solutions

  • High-strength materials for durability
  • Advanced sealing system for waterproofing
  • Pre-fabricated components for rapid installation

Outcomes

  • Extended service life exceeding design requirements
  • Client satisfaction and positive feedback
  • Zero maintenance required in first 3 years