United Kingdom• London
2022
London Urban Overpass Expansion Joint Project 2022-137
Successful installation of bridge expansion joints for the London urban overpass project. The project involved infrastructure modernization with a focus on safety.

Challenges
- •Large thermal movement accommodation
- •High traffic volume requiring minimal disruption
- •Challenging installation conditions
Solutions
- •High-strength materials for durability
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
Outcomes
- •Successful project completion on schedule
- •Client satisfaction and positive feedback
- •Extended service life exceeding design requirements