France• Lyon
2017
Lyon Railway Bridge Expansion Joint Project 2017-106
Successful installation of bridge expansion joints for the Lyon railway bridge project. The project involved infrastructure modernization with a focus on efficiency.

Challenges
- •Challenging installation conditions
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
Solutions
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
Outcomes
- •Successful project completion on schedule
- •Extended service life exceeding design requirements
- •Client satisfaction and positive feedback