France• Marseille
2020
Marseille Pedestrian Bridge Expansion Joint Project 2020-9
Successful installation of bridge expansion joints for the Marseille pedestrian bridge project. The project involved upgrading existing infrastructure with a focus on safety.

Challenges
- •Challenging installation conditions
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
Solutions
- •Comprehensive quality control procedures
- •High-strength materials for durability
- •Modular expansion joint system installation
Outcomes
- •Excellent performance under traffic loads
- •Client satisfaction and positive feedback
- •Successful project completion on schedule