Germany• Munich
2018
Munich Long-Span Bridge Expansion Joint Project 2018-128
Successful installation of bridge expansion joints for the Munich long-span bridge project. The project involved bridge renovation with a focus on safety.

Challenges
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
- •Challenging installation conditions
Solutions
- •Pre-fabricated components for rapid installation
- •High-strength materials for durability
- •Modular expansion joint system installation
Outcomes
- •Successful project completion on schedule
- •Client satisfaction and positive feedback
- •Excellent performance under traffic loads