France• Nice
2024

Nice Pedestrian Bridge Expansion Joint Project 2024-52

Successful installation of bridge expansion joints for the Nice pedestrian bridge project. The project involved bridge renovation with a focus on efficiency.

Nice Pedestrian Bridge Expansion Joint Project 2024-52

Challenges

  • Challenging installation conditions
  • High traffic volume requiring minimal disruption
  • Tight project timeline

Solutions

  • High-strength materials for durability
  • Modular expansion joint system installation
  • Comprehensive quality control procedures

Outcomes

  • Client satisfaction and positive feedback
  • Zero maintenance required in first 3 years
  • Extended service life exceeding design requirements