Canada• Ottawa
2019
Ottawa Railway Bridge Expansion Joint Project 2019-144
Successful installation of bridge expansion joints for the Ottawa railway bridge project. The project involved infrastructure modernization with a focus on performance.

Challenges
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
- •Strict quality and safety standards
Solutions
- •Advanced sealing system for waterproofing
- •High-strength materials for durability
- •Pre-fabricated components for rapid installation
Outcomes
- •Zero maintenance required in first 3 years
- •Excellent performance under traffic loads
- •Client satisfaction and positive feedback