Australia• Perth
2018

Perth Pedestrian Bridge Expansion Joint Project 2018-155

Successful installation of bridge expansion joints for the Perth pedestrian bridge project. The project involved new construction with a focus on durability.

Perth Pedestrian Bridge Expansion Joint Project 2018-155

Challenges

  • Strict quality and safety standards
  • Large thermal movement accommodation
  • High traffic volume requiring minimal disruption

Solutions

  • High-strength materials for durability
  • Advanced sealing system for waterproofing
  • Pre-fabricated components for rapid installation

Outcomes

  • Extended service life exceeding design requirements
  • Successful project completion on schedule
  • Excellent performance under traffic loads