Australia• Perth
2016
Perth Urban Overpass Expansion Joint Project 2016-13
Successful installation of bridge expansion joints for the Perth urban overpass project. The project involved new construction with a focus on safety.

Challenges
- •Challenging installation conditions
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
Solutions
- •Advanced sealing system for waterproofing
- •High-strength materials for durability
- •Pre-fabricated components for rapid installation
Outcomes
- •Zero maintenance required in first 3 years
- •Client satisfaction and positive feedback
- •Extended service life exceeding design requirements