Brazil• Rio de Janeiro
2017

Rio de Janeiro Long-Span Bridge Expansion Joint Project 2017-62

Successful installation of bridge expansion joints for the Rio de Janeiro long-span bridge project. The project involved infrastructure modernization with a focus on efficiency.

Rio de Janeiro Long-Span Bridge Expansion Joint Project 2017-62

Challenges

  • High traffic volume requiring minimal disruption
  • Large thermal movement accommodation
  • Strict quality and safety standards

Solutions

  • High-strength materials for durability
  • Comprehensive quality control procedures
  • Pre-fabricated components for rapid installation

Outcomes

  • Extended service life exceeding design requirements
  • Client satisfaction and positive feedback
  • Zero maintenance required in first 3 years