Brazil• São Paulo
2024
São Paulo Pedestrian Bridge Expansion Joint Project 2024-19
Successful installation of bridge expansion joints for the São Paulo pedestrian bridge project. The project involved upgrading existing infrastructure with a focus on efficiency.

Challenges
- •Challenging installation conditions
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Comprehensive quality control procedures
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
Outcomes
- •Client satisfaction and positive feedback
- •Zero maintenance required in first 3 years
- •Extended service life exceeding design requirements