Spain• Seville
2015

Seville Long-Span Bridge Expansion Joint Project 2015-1

Successful installation of bridge expansion joints for the Seville long-span bridge project. The project involved upgrading existing infrastructure with a focus on performance.

Seville Long-Span Bridge Expansion Joint Project 2015-1

Challenges

  • High traffic volume requiring minimal disruption
  • Challenging installation conditions
  • Large thermal movement accommodation

Solutions

  • Advanced sealing system for waterproofing
  • Modular expansion joint system installation
  • Comprehensive quality control procedures

Outcomes

  • Zero maintenance required in first 3 years
  • Client satisfaction and positive feedback
  • Excellent performance under traffic loads