Spain• Seville
2017
Seville Long-Span Bridge Expansion Joint Project 2017-96
Successful installation of bridge expansion joints for the Seville long-span bridge project. The project involved upgrading existing infrastructure with a focus on safety.

Challenges
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
- •Tight project timeline
Solutions
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
- •Comprehensive quality control procedures
Outcomes
- •Successful project completion on schedule
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years