Spain• Seville
2019
Seville Railway Bridge Expansion Joint Project 2019-111
Successful installation of bridge expansion joints for the Seville railway bridge project. The project involved upgrading existing infrastructure with a focus on durability.

Challenges
- •Strict quality and safety standards
- •Large thermal movement accommodation
- •High traffic volume requiring minimal disruption
Solutions
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
- •High-strength materials for durability
Outcomes
- •Excellent performance under traffic loads
- •Successful project completion on schedule
- •Zero maintenance required in first 3 years