China• Shenzhen
2019
Shenzhen Long-Span Bridge Expansion Joint Project 2019-53
Successful installation of bridge expansion joints for the Shenzhen long-span bridge project. The project involved upgrading existing infrastructure with a focus on safety.

Challenges
- •Tight project timeline
- •Strict quality and safety standards
- •Large thermal movement accommodation
Solutions
- •Pre-fabricated components for rapid installation
- •Modular expansion joint system installation
- •Comprehensive quality control procedures
Outcomes
- •Zero maintenance required in first 3 years
- •Successful project completion on schedule
- •Extended service life exceeding design requirements