China• Shenzhen
2019

Shenzhen Long-Span Bridge Expansion Joint Project 2019-53

Successful installation of bridge expansion joints for the Shenzhen long-span bridge project. The project involved upgrading existing infrastructure with a focus on safety.

Shenzhen Long-Span Bridge Expansion Joint Project 2019-53

Challenges

  • Tight project timeline
  • Strict quality and safety standards
  • Large thermal movement accommodation

Solutions

  • Pre-fabricated components for rapid installation
  • Modular expansion joint system installation
  • Comprehensive quality control procedures

Outcomes

  • Zero maintenance required in first 3 years
  • Successful project completion on schedule
  • Extended service life exceeding design requirements