Mexico• Tijuana
2023
Tijuana Pedestrian Bridge Expansion Joint Project 2023-118
Successful installation of bridge expansion joints for the Tijuana pedestrian bridge project. The project involved bridge renovation with a focus on safety.

Challenges
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
- •Tight project timeline
Solutions
- •High-strength materials for durability
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
Outcomes
- •Zero maintenance required in first 3 years
- •Excellent performance under traffic loads
- •Client satisfaction and positive feedback