Canada• Toronto
2019
Toronto Long-Span Bridge Expansion Joint Project 2019-116
Successful installation of bridge expansion joints for the Toronto long-span bridge project. The project involved infrastructure modernization with a focus on performance.

Challenges
- •Tight project timeline
- •Challenging installation conditions
- •Strict quality and safety standards
Solutions
- •High-strength materials for durability
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
Outcomes
- •Successful project completion on schedule
- •Excellent performance under traffic loads
- •Zero maintenance required in first 3 years