Canada• Toronto
2019

Toronto Long-Span Bridge Expansion Joint Project 2019-116

Successful installation of bridge expansion joints for the Toronto long-span bridge project. The project involved infrastructure modernization with a focus on performance.

Toronto Long-Span Bridge Expansion Joint Project 2019-116

Challenges

  • Tight project timeline
  • Challenging installation conditions
  • Strict quality and safety standards

Solutions

  • High-strength materials for durability
  • Modular expansion joint system installation
  • Pre-fabricated components for rapid installation

Outcomes

  • Successful project completion on schedule
  • Excellent performance under traffic loads
  • Zero maintenance required in first 3 years