Italy• Turin
2023
Turin Long-Span Bridge Expansion Joint Project 2023-183
Successful installation of bridge expansion joints for the Turin long-span bridge project. The project involved bridge renovation with a focus on durability.

Challenges
- •Tight project timeline
- •Challenging installation conditions
- •Large thermal movement accommodation
Solutions
- •Modular expansion joint system installation
- •Pre-fabricated components for rapid installation
- •Advanced sealing system for waterproofing
Outcomes
- •Extended service life exceeding design requirements
- •Successful project completion on schedule
- •Excellent performance under traffic loads