Italy• Turin
2024
Turin Long-Span Bridge Expansion Joint Project 2024-161
Successful installation of bridge expansion joints for the Turin long-span bridge project. The project involved infrastructure modernization with a focus on durability.

Challenges
- •High traffic volume requiring minimal disruption
- •Large thermal movement accommodation
- •Strict quality and safety standards
Solutions
- •High-strength materials for durability
- •Advanced sealing system for waterproofing
- •Comprehensive quality control procedures
Outcomes
- •Successful project completion on schedule
- •Client satisfaction and positive feedback
- •Excellent performance under traffic loads